Popular keywords: Construction pictures of closure net Closing net of post pouring belt Net price Closing mesh Net price How to use the closing net BDF steel cage

Construction pictures of closure net

  • Time: Views: Author
    If you want to really understand the construction of fast and easy to close network, please read this article carefully
    Telephone number: 133-7338-9990
     
    With the growth of the national economy, China's real estate industry has also been rapid development, various types of high-rise buildings. The proportion of high-rise building projects in 2010 is about 70%. With the increase of high-rise buildings, the design strength grade of concrete is required to be higher and higher. Because it is difficult to construct concrete with different strength at the same time, as the construction unit, we need to make reasonable deployment and pay more efforts in process arrangement, construction technology and process control. The concrete of different strength grades between the basement frame column and external shear wall of Zhongshun international business building project is poured at the same time and installed High Ribbed Formwork Take concrete construction as an example to avoid cold joint.
    Propose a solution and determine the best solution

    1、 propose a scheme
    Scheme 1 -----Using the traditional method, separate pouring: through consulting the standard and other data and visiting investigation, two kinds of impermeable concrete with different strength levels between the shear wall and the frame column are poured separately, and the construction joint formed by this will make the waterproof function of the later period not reach the expected effect. After the basement exterior wall construction is completed, polyurethane waterproof additional layer should be added at the construction joint, which not only increases the construction cost but also is not conducive to ensuring the waterproof quality. There are many hidden dangers in the later stage, so the separate pouring scheme is not feasible.
     
    Scheme 2 -----Concrete pouring with dense mesh wire mesh separation: through the investigation and visit of members of our group, this method is mostly used for pouring concrete with different strength grades at lower longitudinal height such as post pouring belt, beam column joint, etc. If dense mesh steel wire mesh is used to separate the concrete at the junction of column and shear wall, because the longitudinal height reaches 3.6-3.8m, the lateral impact force and pressure on the dense mesh steel wire mesh in the process of pouring and vibrating concrete is large, which will not guarantee the dense mesh wire mesh not to be compressed, which will lead to deformation and damage, and can not play an effective separation effect, thus the concrete construction quality can not be guaranteed. Therefore, it is not feasible to adopt dense mesh steel mesh.  
     
    Scheme 3 use High Ribbed Formwork Separated for concrete pouring: quick and easy to close net is a kind of permanent formwork with unidirectional U-shaped ribbed framework and unidirectional three-dimensional network after being processed from thin hot-dip galvanized steel plate. The installation of fast and easy to close network has the following characteristics:
    1) Light weight, excellent mechanical properties and convenient installation are of great help to improve the construction speed.
    2) The mesh hole of quick and easy closing net can help disperse the water pressure produced by cement slurry during concrete pouring, and reduce the pressure of pouring concrete by 2 / 3, so as to ensure that the separation effect of quick and easy closing net will not be affected by deformation and damage caused by excessive lateral pressure.  
    3) When pouring concrete, the remaining corner pieces on the mesh are embedded in the concrete, which can strengthen the combination between the mesh and the concrete, form a mechanical wedge closely connected, and the quality of the joint is strictly controlled.
    4) It is convenient for the reinforcement to pass through and continuously bind the reinforcement. The porous special grid of the closure net can ensure the crossing of the horizontal reinforcement C12 and C14 of the shear wall with a little force.
    If this scheme is adopted, it can not only ensure the effective separation of different strength grade concrete, but also ensure that there is no construction cold joint.
    2. Comparative analysis of various schemes

    3. The scheme is determined: the use of quick and easy closing net can make the concrete of different strength grade combine into a solid whole and prevent leakage, at the same time, it can also avoid the impact of vibration caused by chiseling and roughening on the structure damage. Moreover, the quick and easy closing net can stay in the surface layer after pouring concrete, which can play a reinforcing role and prevent the concrete surface from drying shrinkage and moisture shrinkage cracks.  

    5 Formulate Countermeasures

    1. Cutting the quick and easy closing net: after the quick and easy closing net is transported to the construction site, the size of the finished mesh transported to the site is 2200 × 450mm.
    1) According to the total length of 3.6m for two floors underground and 3.8m for one underground floor at the junction of frame column and shear wall, and the requirement of 100 mm overlap between upper and lower nets shall be ensured, respectively.
    2) The width of the quick closing net installed on the side of the frame column remains unchanged with the original mesh size of 450mm.  
    2. Installation of quick and easy closing net: conduct on-site technical disclosure, and install quick and easy closing net on the side of column after binding reinforcement.  
    1) The column reinforcement shall be bound first. After the column reinforcement is bound, the quick and easy closing net shall be installed on the outside of the column stirrup with the remaining corner piece of the mesh grid downward. After the installation of the quick and easy closing net, the horizontal reinforcement of the shear wall can be bound, and the horizontal reinforcement of the shear wall shall pass through the mesh of the quick closing mesh.
    2) The threaded C20 steel bar is set in the vertical groove of the quick and easy closing net to make a vertical ridge. There are four 40 cm thick walls on the second floor of the basement and three 30 cm thick walls in the first floor of the basement. The vertical ribs and the quick and easy closing net are bound on the column stirrups, and the binding must be firm.  
    3) The transverse reinforcement is made of C25 steel bar with a spacing of 40cm, and the first one is set from 20cm to the bottom. The length of transverse rib of 40cm thick wall is 37cm, and that of 30cm thick wall is 27cm. The transverse ribs are bound on the vertical ones, and both ends are firmly bound with the horizontal reinforcement of the shear wall, and can not slide.  
    As shown in the figure below:


    3. Binding of shear wall reinforcement: mark the specific position of horizontal reinforcement on the quick and easy closing net in advance. The horizontal reinforcement of the shear wall of the second floor and the first floor of the underground is C14 and C12 respectively, which can directly pass through the quick closing net.
    Article from: toddlerinterpreter.com
    4. Installation of column and shear wall formwork: after the wooden formwork is installed, the ends of both sides of the quick and easy closing net are fixed on the wall formwork and column formwork with nails.
    5. Pouring concrete and concrete maintenance: first pour C55 impermeable concrete for column, then pour C35 impermeable concrete for wall, and at the same time vibrate and compact.  


    Implementation of Countermeasures

    Quick and easy to close net sample


    Implementation 1: according to the longitudinal height of the section between the column and the shear wall, the toothless saw is used to cut the quick and easy closing mesh
    Implementation 2: according to the content of the disclosure, install the fast and easy to close network

    1. Make vertical ridge in vertical groove of quick and easy closing net with threaded C20 reinforcement



    2. The transverse reinforcement is made of C25 steel bar with a spacing of 40cm.



    Implementation 3: bind the shear wall reinforcement, and the horizontal reinforcement of the shear wall passes through the mesh grid of the quick and easy closing mesh.



    Implementation 4: install the wall column formwork, and fix the ends of both sides of the quick and easy closing net on the wall formwork and column formwork with nails.  



    Implementation 5 : pouring concrete and concrete curing. Among them, c55p8 impermeable concrete of frame column is not easy to be poured by pumping because of its short setting time and high viscosity, so it must be poured by lifting; c35p6 impermeable concrete of shear wall is poured by ground pump. During the construction, it is necessary to strictly coordinate the construction. Bi Chongbo, the construction worker, uniformly coordinates the mobilization of commercial concrete. Cui Kunling, the quality inspector, observes the pouring situation at any time and gives feedback to the project department in time.
    As the concrete pouring of the wall column of the second floor underground is in the winter construction period, the QC group of the project department adopts the method of late formwork removal for maintenance according to the site conditions. The formwork can be removed 3 days after the external wall column of the second floor underground is poured. After the formwork is removed, the plastic film and straw curtain shall be wrapped immediately to ensure that the concrete in the early stage will not lose water and freeze, and the concrete strength can be increased normally.
     
    Implementation effect

    1. Quality inspection: after the removal of the formwork, we carried out a series of inspections on the established objectives, and the inspection results are as follows:


    2. Economic benefit inspection: since the installation of the fast and easy access network does not belong to the requirements of the original drawings, we handled the project contact list on November 30, 2009, and confirmed by the supervision unit and the construction unit on December 5, 2009. With the consent of both parties, the fast and easy access network shall be purchased in the form of materials supplied by Party A, and the increased consumption of reinforcement, processing cost and installation cost shall be confirmed by means of visa. Compared with the separate pouring scheme, the concrete pouring can be formed in one time by using this scheme, and there is no need to add additional waterproof treatment before the waterproof construction of basement exterior wall. After simple estimation, the cost of chiseling and polyurethane waterproof additional layer can be reduced as follows:
    1) Cutting cost: 2000 yuan
    2) Cost of polyurethane waterproof additional layer:
    (16 × 2 × 0.3 × 3.6 + 28 × 2 × 0.3 × 3.8) × 2 = 196.8m2 × 50 yuan / m2 = 9840 yuan
    3) The total cost of dismantling the scaffold is reduced by 9840 yuan and the total cost is reduced by 9840 yuan.
     
    This QC activity has solved the separation problem of two kinds of impermeable concrete with different strength levels at the same time. After the concrete formwork is removed, the appearance is good and there is no vibration leakage. The project department arranges technicians to track the rebound, and the rebound strength of concrete in 28 days can reach more than 105% of the design strength, which fully meets the design requirements. At the same time, it avoids the construction cold joints in the construction process, better ensures the waterproof effect of the basement wall column joint, and achieves good economic and social benefits.