济南QQ上400块4小时不限次数-济南QQ上400块4小时不限次数_首页

在广西酒店晚上怎么叫服务

 Qianjin closing net reinforced expanding net factory
Popular keywords: Construction pictures of closure net Closing net of post pouring belt Net price Closing mesh Net price How to use the closing net BDF steel cage

hy-rib

  • Time: March 7, 2020 11:52:35 Views: Author

Close up network (construction template network) price: a large number of spot supply, the same day delivery

 

They range from 2 to 8 yuan each

 

Mesh material: iron plate, galvanized plate

 

Common size: 440 * 1600mm 440 * 1800mm 440 * 2000mm

 

Thickness: 0.088 mm, 0.1 mm, 0.12 mm, 0.15 mm, 0.2 mm, 0.25 mm, 0.5 mm can be made to order with special specifications

 hy-rib

Customized telephone: 15614816000 manager Zhao

 

hy-rib

 

What factors determine the price of the construction template network

 

The price of the network is basically considered from the following several factors, taking the ex factory price as an example. If you want to quote the price of the closing net, simply from the required material, plate width, plate length, plate thickness, you can further consider the degree of production difficulty, the number of purchased and so on.

 

There are many factors that affect the cost price, the most important is the fall in steel prices, which is related to the final cost of the network. Generally speaking, the processing cost and other expenses are fixed, and the fluctuation is not big. Therefore, as long as there is a calculation formula to understand the steel price on that day, the calculation after the general will not appear large deviation.
 hy-rib

 

Notes on the use of fast and easy to close network

 

Calculation formula of closing net

 

Quick and easy to close network (template network) - calculation method cost price (yuan) = plate cost + stamping man hour fee + circulation fee

 

1. Wire rope diameter × rope diameter × mesh number △ 4 = weight of wire rope used (kg)

 

2. Line diameter × line diameter × mesh number △ 4 = weight of line used (kg)

 

Add 1 + 2 = weight per square

 

The final price is: weight × silk price + processing fee + logistics fee
 hy-rib