 High Ribbed Formwork

Product introduction
  High Ribbed Formwork It is a kind of template with one-way U-shaped multi rib framework and one-way three-dimensional network, which is made of thin hot-dip galvanized steel plate. It has excellent mechanical properties, self weight, and is especially suitable for segmented pouring concrete. It has advanced scientificalness and extensive practicability, Fixed as a consumable template. When the concrete is poured behind the formwork, the remaining corner pieces on the mesh are embedded in the concrete to form a mechanical wedge connected with the adjacent pouring block. The quality of joints is strictly controlled. The bond and shear strength is comparable to that of well treated rough cut stitching.
 High Ribbed Formwork

 
characteristic:
(1) It has good mechanical properties It is equivalent to 60% of the normal formwork bearing pressure, so it can reduce 40% of the amount of formwork supporting keel.
(2) Direct observation of pouring process Because of its special mesh, the pouring work can be monitored by naked eyes, thus reducing the risk of pores and honeycomb.
(3) Light weight, convenient transportation and installation It is only one tenth of the weight of the common set steel mould, which is quick to install and easy to transport.
(4) Optimize process and increase shear interface During pouring, the mortar penetrates into the interface through the mesh and forms a coarse-grained interface with excellent shear resistance.
(5) It is convenient for reinforcement threading and continuous binding By the porosity of the closure net, a dense special grid can be used to pass through with a little force. The steel bars with larger diameter can be cut through the mesh until the reinforcement passes through the back plate and returns to the position. The quick and easy closing net can also be installed before the binding of steel bars, and then can be inserted through the mesh holes.
(6) Adapt to segment pouring concrete, construction civilization The permanent formwork can bond the next pouring concrete without removing the formwork or making joints. Therefore, the interface preparation is simplified.
(7) The operation of splicing and cutting is simple Multi performance, easy to cut, can bend and bend according to the required die shape.
 High Ribbed Formwork
Product use
Because of the better stress intensity and shape freedom of the closure net than the general mold, it can be used in civil engineering of large buildings. For example, tunnels, bridges, raft foundations, sewers, subways, retaining walls, nuclear power plants, docks, high-rise buildings, marine engineering and irregular or curved surface modeling are used as permanent non demolition formwork of concrete.
 
The basic method of closing mesh is easy to install
 High Ribbed Formwork
 
usage method
It can be used with general traditional stent system The center distance of one phase equal to 20 mm plywood is enough. A quick and easy closing net can be used vertically or horizontally, but the bracket must be at a right angle to the framework. The ribs must always face the side ready to receive concrete A piece of mesh can be cut by sheet metal scissors or disc grinder in the construction site. One phase connecting mesh shall be connected with V-shaped groove of frame, overlapped with each other for 150 mm and well supported. The front and rear tail nets should be overlapped by 150 mm and well supported.   The quick and easy closing net can be used with all common supporting devices. Instead of omitting the work of dismantling the support, steel bars of appropriate shape can be used instead of the commonly used screws.
 
Method of fastening to support
It can be nailed to the steel bar or tied to the steel bar and steel bar with iron wire. The adjacent formwork surface shall be overlapped and overlapped, and the reinforcement on the outer side shall be tightened with a spacing of about 150 mm. The edge of formwork surface shall exceed the support by 150 mm.
The reinforcement can be placed horizontally or vertically in order to adapt to various situations. During the pouring, the supporting parts restrain the template shell. The supporting parts shall be at right angles to the reinforcement of the formwork to support the formwork

Specifications

model Material thickness (mm) Weight (kg) Width (mm) Length (mm) Area( m two )
030 zero point three zero two point six zero four hundred and fifty two thousand and two hundred zero point nine nine
035 zero point three five three four hundred and fifty two thousand and two hundred zero point nine nine
040 zero point four zero three point four zero four hundred and fifty two thousand and two hundred zero point nine nine
045 zero point four five three point eight zero four hundred and fifty two thousand and two hundred zero point nine nine
050 zero point five zero four point two zero four hundred and fifty two thousand and two hundred zero point nine nine
Note: length can be according to user's requirement