 Qianjin closing net reinforced expanding net factory
Popular keywords: Construction pictures of closure net Closing net of post pouring belt Net price Closing mesh Net price How to use the closing net BDF steel cage
Your current position: homepage > common problem >

Application of closing net at the joint of brick wall and concrete

  • Time: 10:27:17, September 24, 2020 Author
First of all, the elasticity of the mortar on the surface of the insulation layer can not meet the requirements; second, it has too much water absorption and is not resistant to freezing and thawing. Strictly control the quality of wiring connector. Its bonding strength and shear strength are comparable to that of the well treated rough grinding gap. In the second pouring process, the process of drilling and unhairing is avoided, the construction period is shortened, and the strength of pouring body is improved. The reason is that under the premise of ensuring the plate quality. The second aspect is that the water absorption capacity of the mortar is not enough. it is large and cannot be frozen. The reason is that under the premise of ensuring the plate quality. Assuming that the choice of the network is relatively simple. split, because of the simplest take-off deformation of the closing net. The reason is that in the process of processing (Gu ó ch é ng), the internal stress of the closing net is not completely released, which is determined by its internal structure. The internal structure forms a closed hole structure in production, even through (t ó NGU ó 1). During the fixed maintenance period, after the upper wall is released continuously, the warping deformation occurs and the external wall leaks and cracks. Assuming that the closure network, that is, the template free network is selected, and the maintenance period is required to arrive, then the probability of sudden deformation is very small. Therefore, the way to deal with (CH ǔ L ǐ) is to adopt. the use of non simple deformation plate and good elastic mortar can effectively prevent the cracks of external wall insulation. Strictly control the quality of wiring connector. Its bonding strength and shear strength are comparable to that of the well treated rough grinding gap. In the second pouring process, the process of drilling and unhairing is avoided, the construction period is shortened, and the strength of pouring body is improved. Let's talk about architecture. If the construction is carried out in strict accordance with the technical requirements, good information (means) will not have the above questions. . Through the Internet. The main reason for the problem of falling off is the adhesive force of mortar and the problem of bonding interface. Free template network, also known as the closure network, is fixed as a consumption template. When pouring concrete behind the formwork, the remaining corner pieces on the grid are embedded into the concrete to form a mechanical wedge, which is connected with the adjacent pouring block. The cohesive force of the mortar has reached its limit. In order to meet the bonding requirements, the manufacturer (company) should participate in (C ā NJI ā foot bonding in strict accordance with the formula requirements. A sufficient amount of latex powder can be dispersed. Strictly control the quality of wiring connector. Its bonding strength and shear strength are comparable to that of the well treated rough grinding gap. In the second pouring process, the process of drilling and unhairing is avoided, the construction period is shortened, and the strength of pouring body is improved. And to choose qualified latex powder. The problem with the bonding interface is that (CH ǔ L ǐ) is not qualified for the underlying treatment, e.g. There are also floating ash, oil stains, dirt, the lower layer is not firm and other reasons, if the use of mouth net, the use of rough surface plate, brush contact agent, in order to progress. . When pouring concrete behind the formwork, the remaining corner pieces on the grid are embedded into the concrete to form a mechanical wedge, which is connected with the adjacent pouring block. The method of disposal (CH ǔ L ǐ) is to construct in strict accordance with the technical specifications and use qualified materials (means).
Last article: Quick and easy to close net Next: no more